PROJECTS
 
 
   
  Name and location Description Completion year Client
Mukundpur,
New Delhi

4.2 KM Elevated Metro Viaduct & Station. Pile foundation of 1000mm dia, 745 Nos.Precast I-Girder. No. of span 143. Station 140 mtr.

2016
Delhi Metro Rail Corporation Ltd.
NA Rail com Road Bridge Patna, Bihar

Voided Slab 16 nos. Cast in situ piles of 1200 mm dia, 264 Nos

2016

East Central Railway

NA Munger, Bihar

Substructure & super structure of rail approach viaduct at Munger. 1455 M. Viaduct. Cast in Situ PSC Box Girder 60 Nos. RCC I-Girder – 24 Nos. Voided slab- 12 Nos.

2016

East Central Railway

Pratapgarh,
Uttar Pradesh

650 M ROB cum flyover. 468 M ROB cum flyover. Fabrication & erection of composite steel plate I-Girder weighing 190.05 MT

2016
PNC Infratech Ltd.
NA Munger, Bihar

Earth work including blanketing Ch. 14.700 to Ch. 19.100. Earth work in filling embankment - 1311000 Cum. Blanketing - 68975 Cum

2016

East Central Railway

Badli, New Delhi

414 M metro viaduct. Pile foundation of 1000 mm dia, 65 Nos. Precast I-Girder

2015

Delhi Metro Rail Corporation Ltd.

Bhojipura, Uttar Pradesh

800 M Long Flyover. Completed 3 months before time. 163 Nos 1.0m piles foundation. 160 Nos. precast and post tensioned and I girder

2014

PNC Infratech Ltd.

Cuttack, Mahanadi
Odisha

2253.1 M long bridge of river Mahanadi and 870.17 M long bridge over river Kathjodi, Orissa. 30Nos. of well of dia 6/8 M. 49.38 M span pre-stressed box girder super structure using precast segmental construction methodology using Launching Girder

2014
Simplex Infrastructure Ltd
DMRC - Phase 3
Nizamuddin, New Delhi

642 M Long Bridge over River Yamuna. 16 Nos. of well of dia 8M. Pre-stressed box girder super structure constructed by recast segmental construction methodology using launching girder

2014
Delhi Metro Rail Corp
Kolaghat
West Bengal

323.1 M Steel Plate Girder Composite
Bridge over River Roopnarayan

2013
Ashoka Buildcon Ltd.
Vaishali
Bihar

Earth work, Blanketing and construction of Major and Minor Bridges in connection with Hajipur - Sagauli new BH rail line project

2013
East Central Railway
Kolaghat
West Bengal

1.019 KM Long New Bridge & 323 M Long Steel Plate Girder composite Incomplete Bridge over River Roopnarayan

  • Completed 8 months before time
  • Perennial and tidal river
  • Composite structure using steel girders with RCC Deck
  • 1.2m dia Pile foundation, depth 38m
  • Pre-stressed box girder structur
2013
Ashoka Buildcon Ltd.
Ganga Rail cum Road Bridge Project
Munger, Bihar

Earth work including Blanketing with construction of formation in connection with construction of north rail approach of Rail cum Road Bridge

2012
East Central Railway
ROB
Najibabad, U.P.

Construction of two lanes ROB of level crossing no. 484-A at Najibabad on Moradabad-Saharanpur section

2012
Northern Railway
NA
Ganga Rail cum Road Bridge Project
Patna, Bihar

Construction of Well foundations including well cap of South Rail Viaduct and Sub-structure and PSC Superstructure of rail approach viaduct in connection with Ganga Rail cum Road Bridge Project

2011
East Central Railway
Bridge over River Morhar & River Sakri
Gaya, Bihar

Construction of Bridges over river Morhar & river Sakri

2011
Central Public Works Dept. (CPWD)
Yamuna Expess-way
Jewar UP

Interchange at Ch. Km. 36.00 of Yamuna Expressway

  • 980 M length, Entire quantity of 1135 Girders was pre-casted & pre-tensioned in 5 months with peak production of 275 Girders per month
  • Launching was completed in 2 months & Entire deck was completed in 2 months
2011
Jai Prakash Associates Ltd.
Munger
Bihar

Well Foundation & Substructure of Four Pier (P27 to P30) of Rail cum Road Bridge over river Ganga

  • 4 Double 'D' RCC Well Foundation.
  • Sinking of 2 Double 'D' RCC Well (18 m X 11 m)
  • Depth of each well varied from 35 M to 55 M
2010
East Central Railway
Ghaghraghat
Barabanki UP

1037 M bridge over river Ghaghragha

  • 16 Well foundations (8 M Dia), 2 Abutments, Sub-structure and Approaches
2010
North Eastern Railway
Kalpi
UP

Construction of 784 M Bridge over River Yamuna

  • Balance Cantilever Pre-stressed Bridge by Pre-cast segmental construction methodology using Launching Girder weighing 800 MT
  • 3 Nos Well Curb using FLOATING CAISSON METHODOLOGY
2009
Nagarjuna Construction Co. Ltd.
DMRC - Phase 2
IP Ext, New Delhi

602 M Metro Rail Bridge over River
Yamuna

2008
Delhi Metro Rail Corp
ROB
Indore, M.P.

Design & Construction of EOB at Juni Indore railway Crossing

2008
Indore Development Authority
Dehri-on-Sone
Bihar

3.061 KM long Precast, Prestressed Segmental Bridge over River Sone

  • 48 Wells with total of 1390 M sinking
  • 46 Spans of 65.84 M & 1 Span of 32.92 M) using pre-cast segmental methodology, Launching Girder weighing about 800 MT.
2007
Somdutt Builders-NCC (JV)
Kolhar
Karnataka

3 KM Bridge over River Krishna

  • 75 Spans, each of 40 M length
  • 450 Pre-cast, Pre-tensioned, Steam-cured PSC Girders; launched using Launching Girder
2006
Bhagiratha Engineering Ltd.
Dholpur
Rajasthan

2nd Chambal Bridge at Dholpur

1999
X
Tunnel
Bihar

Construction of Tunnel from Km 5.639 to Km 6.187 of Chandil Left Bank Canal, Bihar (A world Bank aided Project )

1991
X
Construction of Barrage
Galudih

Construction of Barrage, Head Regulator & Apurtenant Works (including 372 M long Pre-stressed bridge) on river at Galudih (A World Bank Aided Subernarekha Project)

1986
X
Bhimgoda Barrage
Hardwar

Construction of Bhimgoda Barrage and Head Regulators(Including 454 M long Pre-stressed bridge over river Ganga at Hardwar

1983
X
Barrage
Ghaziabad, UP

Construction of Barrage on river Hindon at Ghaziabad (U.P.)

1977